Water Supply Network Băişoara, L=6 Km
Water Supply Network with Storage Tank, Drilling Wells and Chlorination Station Sacel, L = 6.5 Km
Drinking water supply network, pumping stations, Berchesu, Frata Commune
Sewerage network and water supply networks, Stolna Town, L = 4.5 Km
Veterinary Clinic Purge Station 500 pers. equivalent
Electrical installations, heating, plumbing and gas. SUBARU showroom
Pavilion Germoplasma USAMV, Cluj-Napoca, thermal installations, sanitary installations, electrical installations, outdoor and decorative lighting
General contractor for installation, design and execution of HVAC, sanitary, electrical, weak currents and fire-fighting systems
Execution of sanitary and thermal installations
Plumbing, heating and compressed air
Installation work:
Ventilation installations
Heating and cooling installations
Compressed air installations
Deionized water installations
Technological cooling installations
Plumbing
Fire-extinguishing installations with sprinklers and hydrants.
Sanitary installations
Thermal installations
Ventilation installations
Fire extinguishers installations
Natural gas installations
Exteriors networks
Sanitary installations and HVAC
Technological installations
Exteriors networks
Gas networks
Residential and care center of people who are in difficulty ASISTMED, Floresti commune, Luna de Sus, Cluj county.
Construction, sanitary installations, thermal installations, electrical and natural gas installations.
The sector of sowing / gestation
Maternity sector
The sector grows
Fattening sector
Silo feeds
Automation and surveillance
Constructions, installations, equipments
Thermal Central, Hoval air-injector with termic agent - hot water, Radiators circuit and ACM circuit + air curtains
Water management, Sanitary installations - hot water, cold water, recirculation
ACS room, Fire Extinguishing Systems with Sprinklers
Interior Hydrants
Ventilation circuit (air fans, ducts, grills)
Air conditioning circuit (indoor and outdoor air conditioning units, refrigerant duct)
STEVE IMPEX S.R.L. Stolna nr. 125, Săvădisla, Cluj County
Installation work: Indoor Sanitary Installations Outdoor Sanitary Facilities Thermal installations Ventilation and Air Conditioning Installations Fire installations
Installation work office building. Heating installations Cooling installations Fire Extinguishing Installations
Installation work: Indoor Sanitary Installations Heating, ventilation and air conditioning installations Fire Extinguishing Installations
Installation work: Plumbing Heating, ventilation and air conditioning installations
Installation work: Heating, ventilation and air conditioning installations
Within the project, we performed works of: PLUMBING, FIRE INSTALLATIONS, H.V.A.C. INSTALLATIONS,
H.V.A.C. INSTALLATIONS, THERMAL PLANT, SANITARY INSTALLATIONS, INTERIOR INSTALLATIONS, FIRE EXTINGUISHING INSTALLATIONS,
Plumbing, thermal installations, Ventilation installations, electrical installations, Weak current installations, Outdoor sanitary facilities, Electrical and gas installations in the premises, without connections, Resistance structure works, masonry work, Exterior and interior finishing works,
Within the project, the following works were carried out: Plumbing, fire installations, HVAC installations, electrical installations,
The work on thermal, sanitary, ventilation, internal hydrants and inert gas installations took place at the server room for the Tiko Turda cold store, located in Mihai Viteazu Commune.
As part of the Kaufland Baia-Mare Shopping Center Objective, works were carried out by: Plumbing, thermal installations, Ventilation installations, fire installations,
Within the scope of the SMURD Cluj subunit, Gherla municipality, works were executed by: Plumbing, hydrants, thermal installations, electrical installations,
Within the project, the following works were carried out: Indoor sprinkler installations, Installation of pumping group for sprinklers, hydrants, Technological water
Within the project were carried out: Plumbing works Gas installation works (execution and design)
Within the project were carried out: Interior and exterior mechanical installation work
Within the project were carried out: Execution of connections to utilities and installation networks